Wednesday, March 6, 2019

Warehouse Worker

The pyramids were used as last-place resting places after the pharaohs wipeout. The construction on the pyramids was started soon after the pharaoh ascended to and mainly took about 20 years to build. They were aligned with the stars to ensure the pharaohs revolt into the afterlife. in that respect is only one known report of how the ancient pyramids were built. That explanation is created to Herodotus around the year 425 B. C. Herodotus traveled around Egypt collecting verbal news report of this ancient nation. In writing about the construction of the pyramids, he verbalize The method employed was to build it in steps, or, as some scrub them tiers or Terraces. When the base and sub levels were completed, the blocks for the next level were from the ground by means of a cedar sled called a lisch. The sleds were pulled from the quarry to a barge by means of oxen. The blocks of stones was carried up the Nile River on the barge and so unloaded and pulled to the pyramids site. R on Wyatt based his design on the description by Heordotus constructed machines made of wood that easily lift heavy objects. There was a stair case that leads from the opening down to the Royal entombment chamber.Here the Pharaohs personal belongings and riches were place upon the death of the Pharaoh. This staircase was sealed to prevent grave robbers from finding the royal burial chamber and sometimes fake burial chambers were built to fudge would be grave robbers. The stones were pulled up long ramps to the level that was being constructed. The ramps were at least 3 times and long as they were tall. This made it somewhat easier for the oxen and men to get them into place. Once they reached the level that was needed they were make clean up and dropped into place using a contrivances.Upon the death of the Pharaohs death, the mumification necrosis suffice was began and this took 60 days. During the Pharaohs belonging that was to be interred with him would be placed in the guar ded tombs. To prevent the pyramids from leaking during the rainy season, the pyramids were sealed with spine or marble or some other material of the pharaohs choosing. If they did not seal the pyramids they would eventually fill with water and decay everything inside. This process was started at the top of the pyramid and the workers worked down the sides until they reached the bottom.

No comments:

Post a Comment